Photographs & renders
The Craig Mill Bridge Replacement project involved a multidisciplinary feasibility assessment for the proposed complete replacement of the existing bridge located just outside of Buff Bay, Portland.
INTEGER was part of a team of specialist consultants that included social and environmental professionals, collectively assessing the feasibility, requirements and implications of the proposed replacement. Our engineering scope included a civil and structural assessment of the existing bridge and its surrounding location, together with a technical review of the proposed replacement bridge design. The review also included an assessment of the proposed construction costs to support the overall feasibility evaluation and decision-making process.
- Structural Assessment
- Structural Engineering Design Review